Temporary Works

A one pass system creating capping and sub-base to IAN 73/06 revision 1 (2009) in half the programme time of traditional and other stabilisation methods, with the ability to return crop growth on completion.

Surfacing

Stone Surfacing

Standard Stone design

100mm of primary type one stone is spread onto the curing stabilised material and is compacted, consequently this cures with the stabilised layer giving a robust virtually maintenance free very durable surface, this is suitable for short to medium length programmes.

Armoured Surface Design

Armoured Layer design

Primary type one stone is laid over the stabilised layer, this is then mixed with Geobind 2 giving an armoured surface which is completely maintenance free with a design life of a minimum of two years. Geotech is willing to discuss warranties on this surface.

Completed Temporary Work Schemes

Haul roads, compounds, laydown areas and piling mats

A14 4km Haul Road and Compounds

Red Lane Embankment

Reddish Viaduct Compounds and Access Tracks

Gillingham to Gravesend Tunnel Substation

Thorndell Viaduct

Drump Road Haul Road and Compound Cornwall

Kettering Compounds

Walney Offshore Windfarm

Holmes Chapel Viaduct Crewe

Beeston & Tiverton Access Road

Winchburgh Tunnel

Swineburn Haul Roads and Compounds

Milley Bridge Compound

Whitegates Compound

Moulsford Viaduct

Glendon Road Kettering Haul Road and Compound

Crewkerne Haul Road, Compound and Piling Mat 

Safestore Chiswick Piling Mat

Costco Wembley

Loading animation...

Do you have a Question?

Use the form below to email us, or call 01189 796 897.

7 + 15 =